FACILITY, BUILDING & MAINTENANCE SERVICES

 

Camco uses a team with a diverse range of skills which, when merge with our prequalified subcontractors, can manage all aspects of facility and building maintenance services. Using modern construction techniques combined with a sound base of traditional construction management principles born from years of refinement in the construction industry, we have a professional and committed team of engineers and highly experienced field construction staff to form a motivated and project specific team.

We have successfully completed projects starting at a few hundred dollars up to $100,000 across a variety of sites and construction genres. Our systematic approach to managing these types of projects allows us to respond to high priority urgent “call outs” or pre-planned “high-risk” tasks. Our skilled construction staff, backed by a team of engineers, are able to make decisions with confidence providing a high-quality product in condensed time frames.

Regardless of the project type, we are able to “design” a solution to all facility and building maintenance projects.

Here is an example of some of our recent work.

 

Blackwood Primary School Carpark Re-Configuration

Department of Planning, Transport & Infrastructure
UUpgrade of the existing staff carpark and “kiss and drop” zone at Blackwood Primary school. The project included re-configuring the existing carpark layout to accommodate additional parking, safer pedestrian management and a more secure bin storage area. The scope of work included demolition of existing concrete kerbing and bitumen pavements, construction of new concrete kerbing, granular pavement reinstatement, stormwater drainage alterations, block paving, bitumen overlay and new linemarking.

Uni SA Mawson Lakes Campus Courtyard Upgrade

University of South Australia
Upgrade of the existing courtyard facilities in Building J at Uni SA Mawson Lakes. The project included the upgrading of existing hard and soft pavement surfaces to provide a “brighter” more functional space for students to occupy. The scope of works in included demolition of existing concrete footpaths and kerbing, tree removal and pruning, excavation for new soft landscape elements, design and installation of new irrigation, construction of feature block pavement, drainage improvements, turfing, planting and mulching.

Greenfields Wetland Stage 1 Bridge Completion

City of Salisbury
Remedial works to the existing timber boardwalk through the Mawson Lakes wetlands. The project scope includes the removal of 80m of failed timber decking and replacement with new.

Richmond Primary School Wall Repair

Spotless Services Limited
The existing masonry boundary wall is showing signs of a rotation failure with many joints opening up and cracking. The project scope includes fabrication and installation of a structural steel support frame, fixing into the existing masonry structure, painting and making good.

Mount Barker Highschool Gutters & Drainage

City of West Torrens
Construction of a new shared path cycle compliant barrier fence and associated retaining walls along a section of linear park. The project scope includes the removal of the existing timber post and rail fence, construction of a new concrete sleeper retaining wall (60m) and installation of new cycle way compliant barrier fence and rail.

Maslin Beach – Beach Access Renewal

City of Onkaparinga
Re-construction of existing concrete beach access stairs to Maslin Beach. The project scope includes; demolition of existing, base preparation, reinforcing, formwork and concrete placement, bulk filling and handrails.

Craigmore South Primary School Paving Upgrade

Spotless Services Limited
Upgrade of existing concrete block paving areas in the environs of the Craigmore South Primary School. The project scope includes; the removal of existing block paving, regrading of the existing base, supply and lay of new block paving, pavelock placement and edge restraints. The scope also includes; the construction of a new outdoor teaching Amphitheatre incorporating demolition, base preparation, supply and placement of concrete block walls and new block paving.